How the calculator counts
Last Free Day
Free time starts on the availability date. For working-day schedules (APM Pier 400, Maher, NWSA, CMA CGM, MSC) Saturdays and Sundays are skipped while free time runs; for calendar-day schedules (Port Houston, Savannah carrier free time) every day counts. The last day of free time is the LFD. From the day after LFD, every calendar day is chargeable.
Demurrage tiers
Each chargeable day is billed at the rate of the tier it falls in, multiplied by the number of containers. At Port Houston the Sustained Import Dwell Fee ($48.53 per container per day) is added from the eighth chargeable day. At LA/Long Beach, PierPASS TMF and the Clean Truck Fund are added once per container because every loaded gate-out pays them.
Detention and the pre-pull trade-off
Detention free time starts on the day the box leaves the terminal. In the pre-pull scenario the box leaves earlier, so detention free time runs out earlier and chassis days go up. The comparison adds the pre-pull fee, yard days (from pre-pull to delivery), the extra chassis days and any extra detention, against the demurrage you avoid.
Break-even day
The calculator repeats the comparison for 1 to 60 days past LFD, keeping your delivery-to-empty-return gap the same, and reports the first day where pre-pulling costs less than leaving the box at the terminal.