LFD tomorrow? Urgent pre-pull: dispatch@tanologistics.comquotes@tanologistics.com2026 port tariffs
TANOLOGISTICS
  1. Home
  2. Pre-Pull & Yard Storage

Services · Pre-pull & storage

Pre-pull, drop yard & demurrage mitigation

Get the box off the terminal before Last Free Day when your dock is not ready, and stop paying escalating demurrage tiers.

What a pre-pull is

A pre-pull takes an import container off the marine terminal before its Last Free Day (LFD), even though your dock is not ready for it, and parks it on a chassis in a secured drayage yard near the port. On the delivery day the driver pulls it from the yard instead of the terminal. You trade terminal demurrage, which escalates by tier, for a flat yard rate and chassis days, which do not.

Stacked shipping containers in a port storage yard

When it pays: the daily math

Compare what one more day at the terminal costs against what one more day in the yard costs:

Daily costAt the terminal (after LFD)In a secured yard
Ocean carrier demurrage (dry)$200–$400+ per day—
Terminal wharf demurrage$52–$210+ per day (APM Pier 400 40', tiers 1–3)—
Houston Sustained Import Dwell Fee+$48.53 per day from day 8—
Yard storage—$35–$100+ per day
Chassis rentalStarts at gate-out$20–$50 per day (2-axle)
One-time pre-pull fee—Typically $150–$300

Terminal and carrier figures from published 2026 schedules (see port demurrage schedules); yard and chassis are market ranges.

Because terminal and carrier demurrage climb in tiers while yard storage stays flat, a pre-pull usually breaks even after two to four days past LFD at carrier rates, and later at the cheaper wharf-only tiers. The exact break-even day depends on the box, so the calculator works it out for your preset, dates and yard rate.

The catch: detention starts at gate-out

Pulling the container early starts the ocean carrier's equipment detention (per diem) clock early too. If the line gives four working days of detention free time and you pre-pull three days before delivery, you may use most of that free time sitting in the yard. Good pre-pull planning counts both clocks: demurrage saved at the terminal versus detention added outside. Our calculator includes that shift in its comparison.

When we recommend a pre-pull

  • The receiver's earliest appointment falls after LFD and the terminal is in its higher demurrage tiers.
  • The vessel arrived on a Thursday or Friday at a working-day terminal and the weekend will not stop carrier demurrage.
  • Peak season (August–October at San Pedro Bay) when terminal appointments run out days ahead.
  • Houston imports nearing day 8 after free time, when the $48.53/day Sustained Import Dwell Fee starts stacking.
  • Reefer containers with only two free days, where every extra day costs $325–$675+.

Urgent LFD dispatch

If your box hits LFD tomorrow, email dispatch@tanologistics.com with the container number, terminal, LFD and delivery address, or send the rate quote form with "Urgent pre-pull" selected.

Container on the water or already at the terminal?

Send the port, destination ZIP, equipment and your Last Free Day. We come back with an itemized drayage, pre-pull or transload rate.