LFD tomorrow? Urgent pre-pull: dispatch@tanologistics.comquotes@tanologistics.com2026 port tariffs
TANOLOGISTICS
  1. Home
  2. New York & New Jersey

Port gateway · Port Newark & Elizabeth

New York & New Jersey drayage & transloading

Working-day free time, chassis splits and the 2026 Newark rate changes that decide what a NY/NJ container really costs.

Port Newark and Elizabeth

The Port of New York and New Jersey moves most of its containers through the Port Newark and Port Elizabeth terminals, with Maher Terminals one of the largest. The gateway serves the densest consumer market in the country within a day's drive, so most imports move by local drayage or a short transload rather than rail.

Working days vs. business days: why it matters

Maher Terminals LLC Schedule No. 010599 (updated May 1, 2026) gives four working days of free time for dry containers and two working days for reefer and special equipment. A working day at Maher is any day the gate is open, which can include a Saturday gate. Some neighboring terminals count business days instead, which skip weekends regardless of gate hours.

The difference is real money. A container available on a Thursday at a business-day terminal has an LFD the following Tuesday. At a working-day terminal with a Saturday gate, the LFD can land on Monday instead. Check which rule your terminal uses before you book the delivery appointment.

Private NY/NJ terminal demurrage baselines start around $220–$240 per day for standard 20' and 40' containers and escalate in tiers. Ocean carrier contracts often override the terminal's schedule.

Maersk's 2026 Newark adjustment

From January 1, 2026, Maersk raised Newark terminal demurrage by $20 per tier for dry containers and $40 per tier for operating reefers, alongside a $10 per tier increase in U.S. import detention across dry, non-operating reefer and special equipment. If you ship on Maersk through Newark, last year's estimate understates this year's exposure.

Aerial view of a container terminal quay with gantry cranes and stacked boxes

Chassis splits in New Jersey

In NY/NJ the container and the chassis are often in different places. When the chassis has to be picked up from an off-terminal depot before the driver goes to the terminal, or dropped at a different depot after the empty return, the extra mileage and time show up as a chassis split fee. Splits are one of the most common surprise lines on NY/NJ drayage invoices, and they make dual transactions harder to arrange.

  • Ask which chassis pool the line or terminal uses before quoting.
  • Price splits as a separate line instead of accepting a "plus accessorials" quote.
  • Expect fewer dual transactions during peak weeks, which adds trips.

Central and Northern NJ cross-docking

Transloading a 40' floor-loaded container near Port Newark or in Central New Jersey (Exit 8A, Edison, Cranbury) typically costs $850–$1,350+, the highest of the major gateways because of warehouse labor and land costs. It still pays for multi-destination retail freight and for anything heading to New England or the Midwest, where the 3-to-2 trailer consolidation cuts linehaul.

NY/NJ cost line2026 range
Base pull 20' / 40'$300–$500 / $400–$700
Terminal demurrage baseline~$220–$240/day, tiered
40' floor-load transload$850–$1,350+
Chassis (2-axle)$20–$50/day plus split fees

Maher Terminals Schedule No. 010599; Maersk U.S. D&D notice effective Jan 1, 2026; market ranges 2025–2026.

Container on the water or already at the terminal?

Send the port, destination ZIP, equipment and your Last Free Day. We come back with an itemized drayage, pre-pull or transload rate.